The prefab housing has arrived and been constructed at MoMA for their Home Delivery exhibit (opening on the 20th and running through October 20th). The exhibit examines the factory-produced architecture which has been a part of our landscape since 1833; five full-scale residences have been installed in the museum's 54th Street lot, while the 6th floor exhibit delves into the prefab's timeline. Prepare for residential envy! Here are some photos of the construction (the NY Times also has a slideshow)...with the grand unveiling coming next week.