Traffic on the Whitestone Bridge is back running smoothly after an accident yesterday shut it down for most of the afternoon when an overhead sign collapsed and blocked all five lanes of traffic in both directions. The sign and its metal support system, the gantry, came down around 1 p.m. when an MTA Bridges and Tunnels contractor struck it with their truck and the crane attached to its back.


